Authors: A.A. Renyov, S.G. Kostyuk, N.T. Bedarev, I.V. Borodin, O.V. Lyubimov, G.A. Sitnikov
Title of the article: Seaching of ways for the status control of the anchor’s lock in the hole
Year: 2015, Issue: 3, Pages: 43-47
Branch of knowledge: Geotechnology
Index UDK: 622.284.74:622.273.23
DOI: -
Abstract: Analysis methods for monitoring the status of the anchors for mining are shown. Problems associated with the control of the state of the lock in the hole in a variety of conditions, in particular, the operation of the anchor in mines under conditions of suspended monorails are revealed. Results of evaluating the bearing capacity of the length of fastening bolts in a hole structure, which gives prerequisites for the establishment of new structures in the area. The device protected by a patent for utility model, allows you to visually provide the ability to control the lock anchor failure in the host array with its subsequent movement in the hole to limit bias, which is especially important in terms of improving safety of vehicles on the monorail in mines. Way for further research towards integrating the dynamic nature of loads to be bolted is shown.
Key words: excavation suspended monorail anchor lock disruption limit displacement control
This work is licensed under a Creative Commons Attribution 4.0 License.